| शिकायत कोड | शिकायत का प्रकार | जिले का नाम | ब्लॉक का नाम | पंचायत का नाम | गाँव का नाम | पता | शिकायत का विवरण |
|---|---|---|---|---|---|---|---|
| 216861 | ROAD CUTTING COMPLAINTS | Lucknow | Mal | Gorava Baravki | Gorava Baravki | Hamare goan me road pe pani bharane se road me gadha ho gaya hai isse acsident bhi ho sakte hai |
| Agency | JE | AE | EE |
|---|---|---|---|
|
23-Sep-2026 |
23-Sep-2026 |
23-Sep-2026 |
23-Sep-2026 |
| Village Status : In Progress Village | Expected Closure date : 01-Oct-2026 | ||
| Sno | Recording | Call On | Call Mode |
|---|---|---|---|
| Recording Not Found | |||
| जवाब | के द्वारा उत्तर | शिकायत दिनांक | उत्तर दिनांक |
|---|---|---|---|
| Hamare gaon me damar road me pani bhara hai ise fir se banawa di jiye | Complaint User/N/A | 11-09-2026 | 23-09-2026 |
| The potholes on the road caused due to water accumulation have been repaired, and the issue has been resolved. Please close the complain. Attachment | Agency/NCC Ltd.(Lucknow) | 11-09-2026 | 23-09-2026 |
| The potholes on the road caused due to water accumulation have been repaired, and the issue has been resolved. Please close the complain. Attachment | JE/ROHIT KUMAR YADAV | 11-09-2026 | 23-09-2026 |
| The potholes on the road caused due to water accumulation have been repaired, and the issue has been resolved. Please close the complain. Attachment | AE/SURENDRA PRATAP SINGH | 11-09-2026 | 23-09-2026 |
| Please Close the complain. Attachment | Executive Engineer/ARVIND KUMAR TRIPATHI | 11-09-2026 | 23-09-2026 |
| Complaint Closed | |||